Transform your space with precision execution
Execute your Singapore office transformation with experienced contractors and rigorous quality control. We coordinate BCA-licensed trades, manage landlord liaisons for A&A approvals, schedule disruptive works during off-hours, and ensure MEP systems integrate seamlessly. From selective demolition to final punch-list resolution, every construction phase is professionally managed to deliver on-time, within budget, with minimal business interruption.
Expert renovation execution navigates Singapore building codes, respects landlord requirements, and protects your operations throughout construction.






Clearing and preparing the space for new works with proper protection and disposal.
Protection Works
Install temporary barriers, dust containment, and floor protection safeguarding work areas. Hoarding protects tenants from construction disturbances.
Selective Demolition
Remove non-structural partitions, ceilings, and finishes while preserving columns and MEP risers. Selective approach minimizes risk per landlord requirements.
Waste Management
Segregate waste for disposal through NEA-licensed contractors. Compliant waste management avoids fines and supports recycling where feasible.

Building partitions, ceilings, flooring, lighting, and finishes according to approved plans.
Partition Installation
Construct metal stud partitions with soundproofing, install doorsets, and fit glass partitions. Quality work meets fire ratings and acoustic requirements.
Ceiling Works
Install suspended ceilings with acoustic tiles, integrating lighting and ACMV diffusers. Conceals MEP services and creates clean finished appearance.
Flooring Installation
Prepare subfloors, lay carpet tiles, install vinyl planks, or fit timber per specifications. Professional installation ensures durability and warranty compliance.

Delivering and assembling all specified furniture, fixtures, and equipment.
Delivery Coordination
Schedule deliveries after construction, coordinating loading bay access and elevators. Strategic timing prevents damage and ensures efficient installation.
Assembly Services
Professional teams assemble workstations, chairs, pedestals, and storage per specifications. Expert assembly maintains warranties and consistent quality.
Fixture Mounting
Install decorative lighting, shelving, artwork, signage, and accessories per design intent. Proper mounting ensures fixtures remain secure and meet quality.

Final inspection to ensure all work meets the design intent and specifications.
Punch List Inspection
Conduct room-by-room walkthrough documenting every defect requiring correction. Detailed punch lists hold contractors accountable for defect-free delivery.
Defect Resolution
Coordinate contractors rectifying punch list items within 2-3 weeks. Follow-up inspections verify corrections meet standards before final handover.
Systems Testing
Test all switches, outlets, ACMV, fire alarms, access readers, and AV equipment. Comprehensive testing prevents day-one failures and ensures smooth move-in.

Our Office Renovation Process
A phased approach that minimizes business disruption while delivering quality fit-out work that meets landlord standards.
Site Assessment
Survey existing conditions, coordinate landlord approvals, secure A&A permits, and develop phasing plans that allow business continuity during works.
Design Coordination
Translate design intent into buildable specifications, coordinate MEP requirements, finalize material selections, and prepare contractor tender documents.
Construction Management
Execute demolition, build partitions, install ceilings and flooring, coordinate trades, apply finishes—all with daily quality inspections and progress tracking.
Final Handover
Complete punch lists, install furniture and fixtures, test all systems, obtain landlord sign-off, and deliver comprehensive documentation for your records.
Frequently Asked Questions
Common questions about office renovation and fit-out execution in Singapore.